Mark Cockrill
More ideas from Mark
Lloyd Werft profile drawing for P&O Line's Project Gemini (c1990). This project was re-designed into a smaller ship due to a high budget for P&O to built, and was eventualy built in Meyer Werft, and completed in 1995 as Oriana.

Lloyd Werft profile drawing for P&O Line's Project Gemini (c1990). This project was re-designed into a smaller ship due to a high budget for P&O to built, and was eventualy built in Meyer Werft, and completed in 1995 as Oriana.

Meyer Werft concept drawing for P&O Line's Project Gemini (c1991). This design would be evolved and eventualy built as P&O's Oriana in 1995.

Meyer Werft concept drawing for P&O Line's Project Gemini (c1991). This design would be evolved and eventualy built as P&O's Oriana in 1995.