Explore Floor Drains, Laundry Rooms and more!

Explore related topics

Construction Document Details | Jose Robinson | Archinect

Construction Document Details | Jose Robinson | Archinect

builds and delivers the most efficient Wastewater Treatment Solutions in the world

builds and delivers the most efficient Wastewater Treatment Solutions in the world

Basement Waterproofing (dwg - Autocad drawing) - Concrete

Basement Waterproofing (dwg - Autocad drawing) - Concrete

FIG. 4 TYPICAL DETAIL OF WATERPROOFING TREATMENT IN CASE OF ROOF PROJECTING BEYOND THE WALL

FIG. 4 TYPICAL DETAIL OF WATERPROOFING TREATMENT IN CASE OF ROOF PROJECTING BEYOND THE WALL

Chapter 6 - Wall Construction

Chapter 6 - Wall Construction

Steel Stud Parapet “Old Timer.”—Wood blocking and a cant anchored to the structural deck restrain membrane shrinkage at parapet. Notice the continuity of the control layers.

Steel Stud Parapet “Old Timer.”—Wood blocking and a cant anchored to the structural deck restrain membrane shrinkage at parapet. Notice the continuity of the control layers.

Figure 17 — Top chord bracing for tiled and sheeted roofs that have clear spans that do not exceed 8 m

Figure 17 — Top chord bracing for tiled and sheeted roofs that have clear spans that do not exceed 8 m

Pinterest
Search