Explore Landing, March, and more!

Explore related topics

Construction of bottom landing with two steps down to floor.  March 18, 2015

Construction of bottom landing with two steps down to floor.

Construction of bottom landing-- winder stairs.  March 18, 2015

Construction of bottom landing-- winder stairs.

Front unit.  View of loft.  New bathroom framed out.  March 10, 2015

View of loft. New bathroom framed out.

March 28, 2015 view of winder stairs in large unit.

March 2015 view of winder stairs in large unit.

Small (back) unit before deconstruction. March 1, 2015

Small (back) unit before deconstruction.

April 2, 2015

April 2, 2015

April 15, 2015 coming down driveway

April 2015 coming down driveway

April 15, 2015

April 15, 2015

May 5, 2015 front of building.

May 2015 front of building.

April 15, 2015 standing in front of our house looking at rental building

April 2015 standing in front of our house looking at rental building

Large unit drain line through hole in floor.  April 1, 2015

Large unit drain line through hole in floor.

April 15, 2015 Pergola.  Hammock waiting for warm temps.

Hammock waiting for warm temps.

May 3, 2015 front unit colors.

May 2015 front unit colors.

April 2, 2015

April 2, 2015

April 2, 2015

April 2, 2015

Pinterest
Search