Explore Be Proud Of, Contracts and more!

Explore related topics

Adam Ward at Futura Contracts said “F Ball’s adhesives have always given us great results which we can be proud of.

Adam Ward at Futura Contracts said “F Ball’s adhesives have always given us great results which we can be proud of.

The multifunctional sports hall at Barton Court Grammar School benefited from our technical support & product range.

The multifunctional sports hall at Barton Court Grammar School benefited from our technical support & product range.

Stopgap 300 HD smoothing underlayment was installed in public areas at the All England Tennis Club in Wimbledon.

Stopgap 300 HD smoothing underlayment was installed in public areas at the All England Tennis Club in Wimbledon.

Styccobond F60 Contact Adhesive was used at King's College, London, to secure a new Altro vinyl floor covering.

Styccobond F60 Contact Adhesive was used at King's College, London, to secure a new Altro vinyl floor covering.

Styccobond F46 was used to adhere vinyl floorcovering at a library in St George’s University of London.

Styccobond F46 was used to adhere vinyl floorcovering at a library in St George’s University of London.

Stopgap 300 HD and Stopgap 600 Base were used to refurbish the floor at Emmanuel Baptist Church in Hampshire.

Stopgap 300 HD and Stopgap 600 Base were used to refurbish the floor at Emmanuel Baptist Church in Hampshire.

F. Ball Styccobond F41 carpet tile tackifier was used to install new carpet tiles at a sugar-manufacturing site in Newark.

F. Ball Styccobond F41 carpet tile tackifier was used to install new carpet tiles at a sugar-manufacturing site in Newark.

Our F. Ball high performance flooring products were used at a new ITV News Studio!  #ITV #TEAMFBALL

Our F. Ball high performance flooring products were used at a new ITV News Studio! #ITV #TEAMFBALL

Existing floorcoverings at Kings College were removed before installation of Gradus carpet tiles using Styccobond F41

Existing floorcoverings at Kings College were removed before installation of Gradus carpet tiles using Styccobond F41

In the bar of Watford Colosseum Stopgap 400 Repair was used to repair the subfloor before new flooring was installed.

In the bar of Watford Colosseum Stopgap 400 Repair was used to repair the subfloor before new flooring was installed.

Pinterest • The world’s catalogue of ideas
Search