Explore Strong and more!

Explore related topics

The Smart Space quick build system uses strong, but light weight, roll-formed steel sections in place of conventional hot rolled steel.

News about Smart Space who completed a project for Mitchell Powersystems to provide additional loading bay facilities so growth was not impeded

Smart Space completed the actual build on site in just four days, within two months from order.

News about Smart Space who completed a project for Resin Handling Services to provide additional temporary building storage with an actual build time on site of just four days.

Bulk storage of powdered resins is central to the RHS operation - Smart Space temporary building.

News about Smart Space who completed a project for Resin Handling Services to provide additional temporary building storage with an actual build time on site of just four days.

Specialist Cladding Systems (SCS) work on Network Rail’s new car park at Nottingham Station.

Balfour Beatty has commenced work on a £23 million contract for Sheffield Hallam University to construct a £30 million, 10,000m2 building in...

Balfour Beatty has commenced work on a million contract for Sheffield Hallam University to construct a million, building in the heart of Sheffield’s Cultural Industries Quarter.

Architectural Stills » Squint/Opera

HUB has exchanged contracts on the development of 213 new homes in Cathedral Group (Holdings) Ltd and Development Securities’ Old Vinyl Fact.

Alder Hey Hospital – SquareBox Design

Alder Hey Hospital – SquareBox Design

The Smart Space temporary building solves an immediate capacity problem and can provide years of use for Resin Handling Services.

News about Smart Space who completed a project for Resin Handling Services to provide additional temporary building storage with an actual build time on site of just four days.

CMS provided glazing for all four elevations using Kawneer’s AA®110 zone-drained curtain walling with 65mm sightlines and AA®600 top-hung casement windows - Kawneer’s AA®600 commercial entrance doors were also delivered.

CMS provided glazing for all four elevations using Kawneer’s zone-drained curtain walling with sightlines and top-hung casement windows - Kawneer’s commercial entrance doors were also delivered.

This light-weight steel frame three classroom building took Smart Space just 15 weeks to construct at Kingsbury School.

News about Smart Space who completed a project for Kingsbury School who needed a more sustainable answer than hiring prefabricated portable classroomsspace to accommodate new sixth form places.

Smart Space, the temporary building specialist, install a custom built insulated cold store at APS Salads, completed in one week from enquiry.

Smart Space, the temporary building specialist, install a custom built insulated cold store at APS Salads, completed in one week from enquiry.

Smart Space have provided the Mitchell Powersystems with a 20 by 25 metres open-ended covered loading bay.

News about Smart Space who completed a project for Mitchell Powersystems to provide additional loading bay facilities so growth was not impeded

ISG wins 70m Imperial College biomedial hub

ISG wins £70m Imperial College biomedial hub

ISG is preferred contractor on a circa million project to create the new Michael Uren Biomedical Engineering Research Hub at Imperial College London’s research and innovation campus in White City, west London.

Barnshaws deliver curve appeal to Manchester Victoria station

Barnshaws deliver curve appeal to Manchester Victoria station

Sotech push industry boundaries with BSkyB building

Sotech push industry boundaries with BSkyB’s Believe in Better Building

Pinterest
Search