Part of the SFCU spur comes to this light in the utility room to give the switch some power. I made a floating light switch temporarily until the wall partition had been completed.

Part of the SFCU spur comes to this light in the utility room to give the switch some power. I made a floating light switch temporarily until the wall partition had been completed.

I had to adapt many enclosures to accept the seal of the Lap accessories. Above (right) is the double socket outlet plate.

I had to adapt many enclosures to accept the seal of the Lap accessories. Above (right) is the double socket outlet plate.

Look at these earthing conductors. I had to change this.

Look at these earthing conductors. I had to change this.

Electrical Work

I rewired the old jb into this nice enclosure. I used 32A wago's on the rings & 14A wago's on the lights.

I rewired the old jb into this nice enclosure. I used 32A wago's on the rings & 14A wago's on the lights.

This single socket outlet (SSO) had an external photocell light plugged into it. This socket needed updating. I surface mounted a dual SSO enclosure. Fitted a new outlet & an FCU to the external light. The FCU is unswitched as the photocell controls the on & off function of the light. The SFCU (bottom left) was a temporary measure to prevent a hazard emerging.

This single socket outlet (SSO) had an external photocell light plugged into it. This socket needed updating. I surface mounted a dual SSO enclosure. Fitted a new outlet & an FCU to the external light. The FCU is unswitched as the photocell controls the on & off function of the light. The SFCU (bottom left) was a temporary measure to prevent a hazard emerging.

1st fix before & after plastering.

1st fix before & after plastering.

This junction box has since been moved and secured.